How is cavity wall insulation installed?

May 13, 2022 | Cavity Wall Insulation, FAQ

Small holes are drilled in the outside wall into which a specialised insulation product is injected or blown.

Once the walls have been filled with the insulation product, the holes in the brickwork are sealed/rendered, leaving them barely visible. It takes around two hours to complete the job depending on the size of the property.

Call 0800 158 3605 Contact Us
Call 0800 158 3605 Contact Us