How is cavity wall insulation installed?

May 13, 2022 | Cavity Wall Insulation, FAQ

Small holes are drilled in the outside wall into which a specialised insulation product is injected or blown.

Once the walls have been filled with the insulation product, the holes in the brickwork are sealed/rendered, leaving them barely visible. It takes around two hours to complete the job depending on the size of the property.